High Quality Chrome Plate Disposable Cutlery Mould

Location:
Taizhou, China ( Mainland)
Status:
New
Sample Availibility:
yes
Payment Terms:
Cash, Bank Transfer, Letter of Credit, T/T, L/C
Categories:

Product Description

ENA mould is specializing in crate mould, pallet mould, paint bucket mould, food container mould, flower pot mould and garbage bin mould. For the detailed of the company information, please view our ‘’company profile’’ on alibaba carefully. You will get a completed view of this company.

Disposable Cutlery Mould

Detailed description of the Fork/Knife/Spoon Mould:

Basic mould information:

Runner Type

YUDO Hot Runner

Mould Size

560*530*610mm

Mould Weight

810Kg

No. of Cavity

24 cavity

Product capacity

160mm

Product Material

pp

Product Weight

3g

Wall thinkness

1.2mm

Surface finish

High polish

Delivery Time

40 days

There are three levels of mould quality for your option.

Option A: Level A quality (Highest Level Quality)

Mould Base: LKM, 45# Steel

Core/Cavity: S136+Becu

Slider/Insert: S136

Mould spare parts: SKD 61

Hot Runner: YUDO

Mould Life: 1,000,000 shots

Cycle Time: 28s

Option B: Level B quality (Middle Level Quality)

Mould Base: 45# Steel, self-made

Core/Cavity: 718H

Slider/Insert: 718H

Mould spare parts: China Brand

Hot Runner: China Brand

Mould Life: 800,000 shots

Cycle Time: 30s

Option C: Level C quality (Lowest Level Quality)

Mould Base: 45# Steel, self-made

Core/Cavity: P20

Slider/Insert: P20

Mould spare parts: China Brand

Hot Runner: China Brand

Mould Life: 5,000,000 shots

Cycle Time: 32s

Attention pls:

Price varies in different quality level. When you send us the mould inquiry, please offer the following information:

1) Quality level you choose: Level A/Level B/Level C

2) Paint Barrel Photo

3) paint Barrel capacity

4) paint Barrel wall thickness

Disposable Fork/Knife/Spoon Mould Making Process

Processing

Time

Prepare Steel

7days

Surface Dealing

3days

Lathe, Crude Machining

7days

Drill

4days

Heat Treatment

5days

Lathe, Precision Machining

8days

Precision CNC

5days

Polish

6days

Assembling and Fitting

3days

T1 mould test

2days

Total: It is 40 days for first mould testing after mold design is confirmed.

Disposable Fork/Knife/Spoon Mould Quality Control

For the Q/C of mould, there are 3 steps:

1. Mould Material Q/C

- Mould Steel Checking (Hardness, flaw detection)

- Mould Standard Spare Parts Checking (hardness, size, flaw checking)

2. Mould Making Process Q/C

- design checking (part design, mould design, mould engineering drawing)

- Each part of mould’s size checking after machining according to 2D drawing

- mould testing (check mould running condition)

3. Check with customer’s requirement again before mould shipping.

Disposable Fork/Knife/Spoon Mould Pack and Shipping

Anti-rust oil is painted first, then Plastic film, and finally Wooden Case.

Sent together with the mould:

a) Mould manual instruction

b) engineering drawing in flash disk

c) One more set of mould spare parts: heater, ejector pin, bush, water nozzle, water pipe, hanging ring.

Disposable Fork/Knife/Spoon Mould Maintenance

a) When the mould is vacant, spray the anti-rust oil

b) To clean the gate and cooling system regularly

c) Avoid using recycled material if the mould is suitable for virgin material only

After-Sale Service

a) one-year after-sale technique support



This member's information has NOT been authenticated or verified by importexportleads.net or any third party. Only Gold Members have completed an authentication and verification procedure conducted by third-party credit agencies.

For more information on importexportleads Gold Membership, Click here

Contact Information

Company:
 Taizhou Huangyan Ena Mould Co., Ltd.
Phone Number:
  86-576-81108366
Fax Number:
 86-576-81108365