construction concrete joints

Location:
Beijing, China ( Mainland)
Status:
New
Sample Availibility:
yes
Payment Terms:
Cash, Bank Transfer, Letter of Credit, T/T, L/C

Product Description

concrete joints

FAQ

COST-1266 High elastic crack sealing paste is mainly consisted of bitumen and other high molecule materials. It is a kind of ideal sealant which has reached the international advanced level.

It can be widely applied to:

Seal the saw-cutting joins and perimeter joint in bitumen concrete pavement, cement concrete road, High-speed road, bridge road and airport runways.

Seal the crack and prevent water permeation in the precast concrete panels of the building roof.

Company Information

our company is the manufacturer of the COST-1266 High elastic crack sealing paste

Packaging & Shipping25kg/carton

Product DescriptionMain Properties and Characteristics

Good flexibility in low temperature and stability in high temperature.

High cementing performance.

Super resistance to eroding , and outstanding resistance to water, acid, alkali and oil.

Super anti-seismic capability.

Prolonging the life of the road and bringing down the cost of maintenance.

Standards

COST-1266 is complying with American Standard ASTM-1190.

Technical Data

Item

Test Result

Test Method

Penetration/ 0.1mm

36

ASTMD—1190

Softening point /°C

98.0

ASTMD—36

5°CDuctility

45

ASTMD—113

Recovery / %

90

T0662

Flash point /°C

>300

T0611

Modifying agent ratio

>15%

Advised base materials temperature

-20°C—43°C

Advised working&

sealing temperature

160°C—180°C

Advised heating up temperature

180°C—200°C

Application Adding Method

Generally speaking, COST-1266 is used to seal the crack by indirect heating with the FO oil.

Operation steps:

1. Use the suitable tools to clean the crack, remove any dust, oil, grease, print and other contaminants, and keep the crack clean and dry.

2. Hot melt the sealing paste, the heating temperature of the product is about 180°C-

200°C. Usually, we hot melt the sealing paste by indirect heating with FO oil, instead of directly heating and suddenly heating. Before heating, put it into heating container (drum) first, step heat up, the heating time is decided by entirely melting of sealing paste.

3. For better appearance, cover the outside of the joint areas with Ninon film or paper, lest cause contamination when sealing.

4. Let it cool down before pouring and sealing. The best pouring temperature is about 160°C-180°C.

5. Remove the Ninon film after finishing, keep the surface neat.

6. We suggest using COST style heating equipment. This equipment has good quality and can be operated easily. It helps improving the construction quality, and developing good work environment. Ending the pouring work, traffic can be opened in time immediately.

Shelf life It can be kept for 5 years.Precautions

Keep away from fire. Storage temperature too high, the packaging will deform, but no affect

its use.

Avoid to contact fire. No smoking during construction.

If splash on clothes or skin, please flush with water immediately, or ask for doctor



This member's information has NOT been authenticated or verified by importexportleads.net or any third party. Only Gold Members have completed an authentication and verification procedure conducted by third-party credit agencies.

For more information on importexportleads Gold Membership, Click here

Contact Information

Company:
 China Overseas Science & Trade Co., Ltd.
Phone Number:
  86-10-51336511
Fax Number:
 86-10-51336512