2014 HOT Drink Filling Machine Water Filling Machine Water Bottling Machine Guangzhou

Location:
Guangzhou, China ( Mainland)
Status:
New
Sample Availibility:
yes
Payment Terms:
Cash, Bank Transfer, Letter of Credit, T/T, L/C

Product Description

If you want to invest in bottled water plant, please contact me, more than10 years experiences to provide the best quality, service, price, we have oversea installation teams to provide installation,training and maintain service.

2014 HOT Drink Filling Machine Water Filling Machine Water Bottling Machine Guangzhou :

Product Description

BY-CGF-3000-24000BPH Mineral Water Plant

OVERVIEW:

Our BY-CGF-3000-24000BPH bottle filing machine can be used for filling the drinking water, mineral water, beverage, juice and carbonated drinks and so on.

1. This production line is mainly used for bottle drinking water filling operation. The production lines will be pulling covers of the recycling bottles, checking whether there are loopholes in the recycling bottles; Rinsing outside and inside of the bottle; Automatic putting on and disinfecting, filling and capping; Heat shrinkable film seal; Setting handle and plastic bags and other functions combined together.

2. This machine adopts the advanced programmable logic controller (PLC) to control the machine running automatically, so that equipment running more stable and reliable, it is the ideal equipment for bottled drinking water manufacturers.


REFER PHOTOS:

TECHNOLOGY PARAMETER:

CONFIGURATION:

1. RO water treatment system : 500L-100T per hour----------------Provide the pure water for bottling and washing the PET bottle, the pure water mixed the Ozone for retain freshness.

2. Bottle blowing machine : 300ml-20L----------------------------------To make the bottle by the PET preform, there are the Full-automatic and Semi-automatic model.

3. 3 in 1 bottle water filling machine, washing, filling, capping------Washing the bottle, filling the water, and capping the bottle automatic.

4. Automatic Labeling machine or Manual Labeling Stage---------Put your company label on the bottle body.

5. Ink-jet printer--------------------------------------------------------------Print the produce date on the bottle body, we can provide the Laser printer and the Ink printer.

6. Steam label shrinkage tunnel------------------------------------------Shrink the label, and make it cling the bottle body.

7. Automatic film shrinkage packing machine--------------------------Make the film packing with 12/18/24 bottles per package.

Our Services

OUR SERIVICE:

1. Installation & training

1. Supplier provides the training to the buyer; train the operation and management people, until they completely grasp operation skill. The plan installation day is 15 days, debugging day is 7 days, training day 5 days.

2. Supplier provides the training for maintenance people for free . if the training carry out at the supplier’s site, the buyer take responsible for their staff travel expense, the supplier take responsible for the meals and accommodation.

Also, if supplier arrange the experienced engineers to buyer side for supporting installation, debugging and training, the buyer take responsible for their travel expense, meals, accommodation and safe, and pay engineer salary.

3. Training content:

Basic theoretical knowledge

Equipment structure

Installation, debugging, operation

Maintenance, repair

2. Acceptance check

1) The supplier tests and operates the machines strictly for 15 days after finish. And the buyer can arrange their staff or third-party organization to check and accept the equipment according to the promissory technology parameter in supplier factory before delivery.

2) The supplier supply all the brand component, materials, machinery according to the quotation.

3) If the equipment meets each assurance value during performance appraisal after installation and debugging by supplier, then the two sides sign the acceptance inspection reports.

WARRANTY:

The equipment enjoys 12 months’ quality warranty for free since the equipment is accepted by the buyer. If the equipment failed to work within 12 months, repair for free. The supplier provides long-term after-sale service and free technical advice and training services.

WHY CHOOSE US:

1, We enforce the ISO9001:2008 quality management system strictly. We have the falutless quality control program, From product design, raw material selection, spare parts inspection, To machanical product inspection, skilled workers, ex-factory inspection , packaging ways, etc.

2. We provide the whole mineral water productionline machines and experienced to make the mineral water production line turnkey project.

3, Our chief engineer and the main technical personnel have above 10 years experience, a number of technologies are national patents;

4, We promise 1 year warranty for all products, long-term technical support;

5, We always put customers' view in the first place , create value for the customer's business.

OUR PROJECT EXPERIENCE: from 2011-2014

NoCountries and RegionsProduction capacity
1Ghana 6000 Bottles/H 3 sets
2Nigeria 6000 Bottles/H 2 sets
3Tanzania

3000 Bottles/H 3 sets

6000 Bottles/H 2 sets

12000 Bottles/H 1 sets

4Iraq 4000 Bottles/H 3 sets
5Kenya 12000 Bottles/H 1 set
6Angola 24000 Bottles/H 1 set

BUYER SITE INSTALLATION PHOTO:

Packaging & Shipping

The products are packed with standard export wooden case as below, and it is suitable for long distance sea and land transportation.

Company Information

About us:

Guangzhou Boyuan Packing Machinery Co., Ltd. has been dedicated to water treatment and water filling machine field since 2003, specializing in the production of reverse osmosis (RO) systems, ultra-filtration (UF) systems, small bottle water production line(330-2000ml), big barrel water production line( 3L-20L), and so on. Our company possesses 11 years rich experience in the research & development, manufacturing, marketing, debugging & installation, repair & maintenance, pipeline direct drinking water project and other aspects of water treatment.

We have sold the machines to Europe, Africa, South America, Middle east, we are confident of our quality and service.

Our Customer and Competition:

Our Factory:

FAQ

FAQ:

1.Q:Are you a factory or trading company?
A:We are a factory, professional water treatment equipment manufacturer and small bottle water production line with about 10 years experience. Factory covers an area of 5600 square. There have been more than 30 countries use our products

2.Q:Where is your factory located? How can I visit there?
A:Our factory is located in Huadu District,Guangzhou City, Guangdong Province, China, about 20 minutes away from Baiyun Airport .All our clients, from home or abroad, are warmly welcome to visit us!


3.Q:What is the features of our company?
A: We provide turnkey project for customers, including pre-sale and after-sale service; complete production line equipment supply; bottle design; layout programs provide; or provide auxiliary materials purchasing agent supplier information; equipment overseas installation and commissioning; operator training; etc

It is so pleasure to receive your enquiry, offer support for your business!



This member's information has NOT been authenticated or verified by importexportleads.net or any third party. Only Gold Members have completed an authentication and verification procedure conducted by third-party credit agencies.

For more information on importexportleads Gold Membership, Click here

Contact Information

Company:
 Guangzhou Bo Yuan Packaging Machinery Co., Ltd.
Phone Number:
  0086-020-36979903
Fax Number:
 0086-020-86806599